Today we had a meeting with our cable guy to work out what telephone, co-ax and network cables etc we wanted wherever.
At the time there were a couple of guys in the basement doing the ductwork. The ductwork looks pretty much complete. Week beginning 16th May should see all cables and wiring going in, not sure what the plumbing schedule is but it can't be far away now.
Cable guy says we should be in MUCH earlier than our scheduled closing in late September.
It was still raining but at least the roof is on and everything inside was dry.