24 April, 2011

Going up

As it has been more than two weeks since the basement was poured (6 April) and about 10 days (13 April) since it was back filled we took a trip out to the house on a wet Saturday to see the progress.
Last time the house was 'going down' as the basement was dug out but now the walls are going up. Now we just have to hope it stops raining soon.

From the living room to dining room to kitchen, breakfast area and family room at the back (Note ladder going to basement on the right).



Master bedroom



Family room with central fireplace and back door. Wall to master bedroom on the right.

Walk-in pantry in centre (to the left of the blue jacket!) and the back of the master walk-in closet on the extreme left.



Living room, looking out onto the road