28 June, 2011

Tiled out

We couldn't miss the opportunity to check the progress on the house during a quick trip out to sign more paperwork so here's the latest pictures. All the floor tiling is done, the kitchen cupboards are roughly in position but not secured and likewise the oak caps on the half walls.
Looks like bathroom tiles are next....


A glimpse of the ensuite...


A gaze at the kitchen cupboards....


A gaze on the kitchen from a different angle....


and a glare at the hallway and stairs to basement....

14 June, 2011

Drywall on

So, a visit on 11th June showed that the drywall is now installed. This week they are installing the trim that can be seen stacked in the Living / Dining Room.
I was dis-appointed that only the drywall had been done since our last visit. However I spoke to the builder today and he said that closing could be at the end of July if we wanted that. I was happy to hear that although I said that the end of August suits us perfectly.

Here's the pictures...(look at previous posts for more inc. outside)


Family room


Dining Area from the Living room


Front Door / Living Room windows


Breakfast area (th'other side of half wall)